Warning: error_log(/home/wzg123vwizegi1u2g3/wwwroot/caches/error_log.php) [function.error-log]: failed to open stream: Permission denied in /home/wzg123vwizegi1u2g3/wwwroot/san/libs/functions/global.func.php on line 536

Warning: error_log(/home/wzg123vwizegi1u2g3/wwwroot/caches/error_log.php) [function.error-log]: failed to open stream: Permission denied in /home/wzg123vwizegi1u2g3/wwwroot/san/libs/functions/global.func.php on line 536
Correct operation flow of elbow machine elbow machine,tee machine,elbow bevelling machine supplier
简体中文 | English
SEARCH:
Home About us Products Press Room Service Certificate Case Show Technical Support Contact Us
You are located : Home > Press Room > Industry News >
Press Room
- Company News
- Industry News
- Products News
- faq
ProductList
Elbow Machine
Pipe Bending Machine
Mid-Frequency Induction Pipe Bending Machine
Mid-Frequency Induction Pipe Expanding Machine
Pipe Expanding Machine
Tee Machine
Hydraulic Press machine
Bevelling machine
JCO JCOE Welded Pipe Production Line
Straightening Machine
Steel Pipe Hydrostatic Pressure Tester Machine
Plate Rolling Machine
Shot Blasting Machine
Accessories
 
 
 
Industry News
 
Correct operation flow of elbow machine
Time:2022-12-13 08:49:42  Clicks:
Correct operation flow of elbow machine

Do it carefully before operation of elbow machine

1. The machine tool must be well grounded, and the conductor shall not be less than 4mm2 copper flexible wire. Do not allow the power supply voltage beyond the specified range to be connected. Do not plug or remove the plug-in while live. Do not use the megohm meter to test the control loop, otherwise the device may be damaged.

2. When inserting and removing the connector, do not pull out the wire or cable to prevent the welding from pulling out.

3. Proximity switch, encoder, etc. can not be hit with hard objects.

4, can not use sharp objects collision display unit.

5, the electrical box must be placed in a ventilated place, can not work in dust and corrosive gas.

6. Do not install or change PC input and output terminals without permission.

7. When replacing the power supply of the machine tool, the motor steering must be reconfirmed.

8, the machine should be kept clean, especially pay attention to the clamping block, slide block and other sliding groove should not have foreign bodies.

9. Add lubricating oil to the chain and other sliding parts regularly.

10. The power supply must be disconnected during cleaning and maintenance.

11. Preparation before starting: check whether the oil level of the oil tank reaches the oil level line, add oil at each lubrication point, start the machine to confirm the motor steering, check whether there is abnormal sound in the oil pump, and check whether there is oil leakage in the hydraulic system after starting the machine (the Angle encoder is not allowed to add oil);

12. Pressure adjustment: Adjust the pressure with the electromagnetic relief valve to ensure that the system pressure reaches the required working pressure, generally no higher than 12.5Mpa.

13, mold adjustment: mold installation, requires the mold and clamping block to the center, clamping block can be adjusted by bolts; The booster block is aligned with the mold, and the booster block is adjustable; Align the core head with the mold, loosen the bolts of the core head frame, and tighten the bolts after adjusting the center.

The above is the company for users to briefly introduce the correct operation process of elbow machine, welcome users interested in elbow machine to visit the company and consult!

Quick to find the product information
 
Contact us
Cangzhou Aocheng Machinery Equipment co., LTD.
Address : Bobei Industrial Zone, Mengcun Hui Autonomous County, Cangzhou City, Hebei Province, China
Mobile : +86-15230713671
Fax : +86-317-6218625
E-mail : 15230713671@163.com
Skype : zhiguang.wu
About Us |  Products |  Order Online |  Contact Us Copyright © Elbow Machine,Elbow Forming Machine,Tee Machine All Rights Reserved manage